04 June 2026
Resurfacing
Further to the News item on 28 May, resurfacing works will take place on Tue & Thur 9 and 11 June. Impacted Estate roads will be closed for parts of these two days with diversion signs in place. The roads will not be closed on Wed 10 June. 
 
Residents may wish to move their cars way from their property if it is on one of the resurfacing routes and they require their car over the two days. The Road closures, when required, will be:-
 
i) Deneside - on the east side of the Greensward from the small triangle, north for about 100m between #18 and #26A. Signs will direct traffic to the west side of the Greensward
ii) Michel Dene Road - from just north of Summerdown Lane, north for about 100m between #27 and #35. Signs will direct traffic via Summerdown Lane 
iii) Summerdown Lane - at the top of the road for about 60m from around #46 up to The Link. Signs will direct traffic via MDR. (MDR and SDL will not be closed at the same time).
 
Any kerbstones identified in the annual survey as requiring resetting will be attended to, but it is not the intention to address crossovers/driveways. Please take care when following the diversion signs and travelling over any planed surfaces. Information on other road maintenance works will be advised in due course.
sitemap | cookie policy | privacy policy | accessibility statement